biggeeeee
Retired - Living the dream
- Posts
- 11,090
- Location
- Lanarkshire or Argyll
Started my project this week and hopefully getting to grips with the welding next week.
Two jobs I need to do this week are Remove the Power Steering Box as its leaking badly and secondly replace a bulb in the front fog light.
RAVE procedure describes how to remove the power steering box and makes mention that the coolant has to be drained and the cooling pipes running alonf the chassis rail needs to be removed, looking at it, this seems a little over the top but may be correct.
Anyone removed the box without dropping everything else?
The Discovery is a facelift model and the Fog light is mounted behind the front bumper, how does it release?. The version of RAVE I have covers the Pre Facelift model.
3rdly, Anyone local to Glasgow know the best place to buy sheet steel for welding?
Any help appreciated.
Two jobs I need to do this week are Remove the Power Steering Box as its leaking badly and secondly replace a bulb in the front fog light.
RAVE procedure describes how to remove the power steering box and makes mention that the coolant has to be drained and the cooling pipes running alonf the chassis rail needs to be removed, looking at it, this seems a little over the top but may be correct.
Anyone removed the box without dropping everything else?
The Discovery is a facelift model and the Fog light is mounted behind the front bumper, how does it release?. The version of RAVE I have covers the Pre Facelift model.
3rdly, Anyone local to Glasgow know the best place to buy sheet steel for welding?
Any help appreciated.