I would just like to say

This site contains affiliate links for which LandyZone may be compensated if you make a purchase.
Today we ran all 4 x 100Metre runs of underfloor heating pipe and then we put down 33% of the laminate flooring.
We had to do this because the entire kitchen arrived a day earlier than anticipated and we needed a place to "park" it in the house before fitting it.
A long day for an old boy like me, but very satisfying. Here's Thom & my Son after hauling all the heavy items in off the drive.
Thom intends to carry on laying the flooring tonight so that the kitchen can be fitted ASAP.
A good day's work.

20200811_181823.jpg
 
Back
Top