Elefantman
Active Member
- Posts
- 101
evening all,
started the strip down of my s2a project.. pulled out the load bay plywood the last owner fitted only to find holes in the floor of the tub. Can see it's a mix of spot welds and pop rivits to remove.. question is does it have to be replaced/refitted like for like for mot? Or can I use 2mm alloy plate and just pop rivit it to the edges/cross braces/top hat bits (oddly these are in good nick).
Cheers, James
started the strip down of my s2a project.. pulled out the load bay plywood the last owner fitted only to find holes in the floor of the tub. Can see it's a mix of spot welds and pop rivits to remove.. question is does it have to be replaced/refitted like for like for mot? Or can I use 2mm alloy plate and just pop rivit it to the edges/cross braces/top hat bits (oddly these are in good nick).
Cheers, James