I have been sitting on a series 2a 109 project for the best part of a year now but haven't been able to do much with it due to lack of time. However I'm looking at getting stuck into it now and I think one of the main things that needs to be done is a new bulkhead. However it's proving tricky knowing where to start and being on my own doesn't help, so I was wondering if there was any advice out there as to the best way to go about this. All help is greatly appreciated, thanks.
Nice project!

2a is one of my favourite landies, I have had several.
No easy way with the bulkhead, it s a big job, just a matter of taking it steady, keep on unbolting stuff until you have exposed the bulkhead, then removing it.
As above^^^^^^^^^^^^^^^^^^^^, start with the wings and front panels, when everything is off, work on the windscreen, top panels,doors, and the floor behind the bulkhead. Big job, but not too technical.
Make very sure you take lots of pics first. And/or label all wires, cables,etc.so you know where to route them on the new bulkhead when installed.It looks easy when it is all together, but when you come to rebuild it isn't so straightforward, especially after a few weeks!
When it is out, examine carefully, many can actually be repaired, and then repainted or galved before re-installation.