C-Pillar Replacement

This site contains affiliate links for which LandyZone may be compensated if you make a purchase.

8619Simon

Member
Posts
73
Location
North Wales - Bethesda
I am in the process of fitting out the back of the 110 for a trip to Morocco in October. The previous owner had put two strips of chequer plate down the bottom of the C-Pillars :mad: Well a bit of drilling and poking about with a screw driver showed why! The bottoms are fairly well none existent.

I know I can get the replacement parts from YRM but not being a Welder I was wandering how long or difficult a job this will be to replace. I could do with some ideas for time if possible before I start to shop around.

Cheers

Simon
 

Attachments

  • IMG_0431.jpg
    IMG_0431.jpg
    290 KB · Views: 182
  • IMG_0428.jpg
    IMG_0428.jpg
    386.5 KB · Views: 184
  • IMG_0429.jpg
    IMG_0429.jpg
    263.6 KB · Views: 177
  • IMG_0430.jpg
    IMG_0430.jpg
    293.6 KB · Views: 168
dunno, but I guess the best I could say is it depends what else you find during the strip down.
Ive got the same problem on mine and I'm studiously avoiding it for the moment.
 
I know what you mean! I had avoided looking under the bits of chequer plate for a year then one foolish moment with a drill and screwdriver. The sill rail etc is all good as far as I can tell. Needs a new floor in the rear tub but that will be for another day and I can do that myself. It's just an idea on how long a welding job the c pillars are likely to be so I can get an idea of cost.

Cheers
 
Back
Top