Wiring diagram seems pretty simple, ACM checks sensors and then switches on, ECM then check Evaporator temp and grants the compressor signal........ Might check the HEVAC module tomorrow
For anyone wondering the duel switch has a Schrader valve and can be changed with the system pressurised...