OK folks, update time....
Front suspension lift in, with the incorrect/correct 'Defender' socks, +2 pipes and adjusted spring retainers in place:
And I've cut the old latch retainer plates off the frame, and prepped the new box-section steel to be bolted and welded in place:
I've also received and fitted the Torqueflite dipstick, put on the Challenger rims and started working on the exhaust.... And a friend has donated an unused 50something inch light bar!
Background work is still the dashboard, fuseboxes, switches, steering column switches, headlights, transmission tunnel, Hi/Low shifter, bleeding the brakes, fitting the windscreen wipers, tachometer and speedo.... /deep breath/ etc etc etc etc...


