2.5 n/a. Straight from army. The Wolf. Craig b yes good idea try bleed first. Will do. If not then overhaul of all systems might be the way forward. New master and Slave and flex hose.
Yes I understand. My friend said once slave and master are installed and open bleed nipple at slave and get container ready with tube at bottom and get a two people. One at under ready to close off. And the second person to pour the fluid and let it run out at bleed nipple and yell stop pour once he closed the nibble and then do the normal procedure of bleeding with three down and up open and close etc.