Boris113
Well-Known Member
I'm just in the process of nailing a Southdown snorkel onto the 90.
The destructions that I got from the internet say to position the wing moulding 120mm in front of the bulkhead, mark hole and cut etc but that is dead above the heater motor so won't work.
Could anyone confirm whether the steel pipe should be further back and fit down between the blower and the bulkhead, or further forward and enter the wing in front of the heater?
Cheers
The destructions that I got from the internet say to position the wing moulding 120mm in front of the bulkhead, mark hole and cut etc but that is dead above the heater motor so won't work.
Could anyone confirm whether the steel pipe should be further back and fit down between the blower and the bulkhead, or further forward and enter the wing in front of the heater?
Cheers