LOL,
I have seen somthing similar, Once When I was running a constructionsite in Afghanistan, We used up all our nice Yank rated cable. My Afghan workers said no problem they will sort it. The next day im driving around the site to find nothing more than Cat 5 cable they used all the wires beig run from the Genny to to the other end of the site aprox (500 Meters). I thought this was bad but every time they wanted to use a drill they would cut into it nail 2 long nails into a piece of wood and wrap the cat 5 around the nails and then do the same with the drill. It were a nightmare! Plus when it snowed all you could see was wires cutting through the snow to the ground all the resistance and heat it generated. It took me about a months to get it straight the afghans thought it was the way to fo it. And we won some praise from the State department for our efforts in health and saftey opposed to the other camps. Lol Jai