so if I were to run, 35mm from 2nd alt to boot, then 70mm from batt to winch that would be fine, when under load ( the winch) would that put any extra strain on the other cable considering its approx. 5 meters from alt?
or would I be better running 70mm from front to back and to winch (don't...