Finally picked up a project 90

This site contains affiliate links for which LandyZone may be compensated if you make a purchase.

azza32

New Member
Posts
69
After some searching picked up a 90 to start a project
200 tdi soft top with 60,000 miles must say im rather pleased :)
 
will attach a few more when ive got a little more time to mess about with file sizes
 

Attachments

  • DSC00035.jpg
    DSC00035.jpg
    223.4 KB · Views: 408
  • DSC00042.jpg
    DSC00042.jpg
    233.8 KB · Views: 390
Last edited:
2 previous owners before me
ive got all its mot's and its service history upto 6,000 miles ago
the second owner has his own company so everything has been done through his company
 
plans are to get a new bulkhead as this current one has rusted too badly
money permiting get a galvanise chassis
and give it a respray and good tidy up
 
Did a little work towards starting stripping the 90
removed seats and cubby box
removed rubber matting
also removed swing away spare wheel carrier which i plan on selling
 

Attachments

  • 09-08-10 cubby box removal.jpg
    09-08-10 cubby box removal.jpg
    227.8 KB · Views: 267
  • 09-08-10 matting removed.jpg
    09-08-10 matting removed.jpg
    231.7 KB · Views: 279
  • 09-08-10 seats~cubby box removed.jpg
    09-08-10 seats~cubby box removed.jpg
    240.6 KB · Views: 271
Managed to get a few more parts stripped off today
Removed bumper and A bar
remove checkerplate from sills and rear
removed most the bolts that hold the sside steps on but think the rest need the grinder
also changed my wheels for some old ones as sold them cause putting new ones back on
 

Attachments

  • 10-08-10 Bumber and A bar gone.jpg
    10-08-10 Bumber and A bar gone.jpg
    226.6 KB · Views: 201
  • 10-08-10 checkerplate and wheels gone.jpg
    10-08-10 checkerplate and wheels gone.jpg
    228.9 KB · Views: 192
  • 10-08-10 white alloys gone.jpg
    10-08-10 white alloys gone.jpg
    238.5 KB · Views: 214
Hi there mate - and good luck doing what you've got planned :) i've started doing the same as you, started a few months ago (although my chassis was well and truely buggered - so glav was only option) What i've ended up doing is refurbishing and refreshing everything on it - just what I wanted to avoid!!! :) With the limited time I have, it's taking its time!!!! It had been suggested doing a straight swap - then do a rolling restoration . . guess it's a time thing lol . .

As I said - good luck . . it good fun I have to admit, even if somewhat frustrating at times!!!
 
Looks good that .

Wonder what happend to that other member a while back ( cant remember his name ) that bought that white coverd on moss and green ****e soft top ? .
 
not even halfway through stripping and already rusty bolts are making this take 5x longer grrr :mad2:
 
looks good mate. good luck with the project. i not long ago got mine up an on the road. now im driving it all sorts of things are going wrong :( time to spend spend spend !
 
been busy again this week managed to dismantle the 90 some more
the rain has stopped my fun for today so thought ill show a few pictures
also have the back tub removed but was too wet too get any pictures
 

Attachments

  • 19-08-2010 drivers side removed.jpg
    19-08-2010 drivers side removed.jpg
    224.5 KB · Views: 210
  • 17-08-2010 floor removed.jpg
    17-08-2010 floor removed.jpg
    237.6 KB · Views: 220
  • 17-08-2010 bulkhead rust.jpg
    17-08-2010 bulkhead rust.jpg
    226.9 KB · Views: 230
  • 15-08-10 canvas removed rear.jpg
    15-08-10 canvas removed rear.jpg
    234 KB · Views: 214
got some more progress pics for you all
 

Attachments

  • 22-08-2010 rad and intercooler out.jpg
    22-08-2010 rad and intercooler out.jpg
    244.2 KB · Views: 301
  • 22-08-2010 chassis rust.jpg
    22-08-2010 chassis rust.jpg
    249.2 KB · Views: 223
  • 22-08-2010 chassis.jpg
    22-08-2010 chassis.jpg
    248.5 KB · Views: 217
  • 22-08-2010 engine.jpg
    22-08-2010 engine.jpg
    246.2 KB · Views: 245
Back
Top